Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts

Friday, May 27, 2011

Get It In Writing!

You’ve heard it before, but it bears repeating, GET IT IN WRITING! How many times have you contracted for a home improvement project and when it was done, the end product wasn’t what you were expecting? If you’ve experienced this, it’s common, so don’t feel bad.

Both the homeowner and the contractor want a successful project and are looking for a win-win. One of the best ways to achieve success is to have all the details down on paper so everything is understood up front. If this is so obvious, how come some contractors don’t provide details and customers don’t ask for them? Read on, I’ll tell you why.

This is the scenario: The “completed” job is missing a few things the homeowner assumed would be done. When asked about them, the contractor replies, “They weren’t included in the contract.” (Not included items can be anything from hauling away trash, to touch up painting, to reinstalling window coverings that came down when replacing windows, to who was supposed to pull the building permit, etc., you name it.)

Most items are not big things, but potential extra charges at least.
The homeowner responds: “Well, we assumed _________ was included in your bid!” The contractor counters with: “There’s nothing in my contract about doing that.”
Homeowner responds: “Well, I thought we talked about it! The job isn’t complete until _________ is done!”

At this point, you are at a stalemate. You thought you had a complete job, with a final dependable price. The contractor is acting defensive. He feels he’s about to be nickeled and dimed for some extras he didn’t charge for. Obviously, no one wants to be at this point.


It doesn’t pay to accuse the contractor of promises you heard. If you received more than one bid on the job, there may have been promises made by other contractors that you’re mistakenly applying to this contractor. Honest contractors will often recall a previous conversation about your issue and try to work out a solution. Other contractors may claim the conversation never took place. The estimating and bidding process is a detail laden, code rich environment that most homeowners are unfamiliar with. On top of that, speaking with several contractors about aspects of your project can create confusion as each contractor may have a different approach. It’s no wonder that “who said what” becomes a blur.

How do you prevent this? GET IT IN WRITING! But you need to get two things spelled out clearly.

1. Make sure everything that you want done on the project is written down on the contract.

2. Make sure the contractor writes down everything that ISN’T INCLUDED and what he’s NOT doing. This is as important as item #1.

As a layperson, you aren’t expected to know every aspect of your project that should be written down. This is the responsibility of the contractor. Unfortunately, many contractors don’t like to get too detailed for a couple of reasons.

First, the details on complex jobs can be tedious to explain, have many choices to review and time consuming. Many of us contractors didn’t get into theis business because we love paperwork and documenting details. If that was the case, we’d all be attorneys. Why, I’ve heard that 70% of us have ADD and just want to do our jobs, please our customer, and move to the next job. That’s why we tend to skip details during the estimating stage. There is nothing sinister or intentionally deceptive about a contractor skipping details. Contractors are doers not writers.

Secondly, some contractors feel that excessive details in the paperwork may complicate things during the work phase. When a field condition, supplier interruption, or unforeseen condition requires a change to what was originally specified, writing a change order, getting an approval from the homeowner, and refiguring the cost often bogs down the contractor who’d prefer to substitute in another item to just keeping working on the job. It’s important to note that a substitution isn’t generally an attempt to cut corners. Also, I am not excusing or condoning the lack of clear, precise and detailed paperwork.

Generally, 1 hour spent planning, specifying, and writing down details saves about 10 hours of explaining and resolving disputes. With that in mind, here are some helpful tips:

1. If your contractor has very simple forms and minimal paperwork, be prepared to assist in documenting what you want and what you expect. Ask the contractor to explain everything about the process, step by step. Ask questions if you don’t understand. Don’t allow yourself to be rushed.

2. Be wary if the paperwork is minimal compared to other contractors’ paperwork. That could indicate a contractor who is counting on your vague understand of what’s required to do the project, then doing minimal work, and relying on the phrase, “Well, it wasn’t in the contract.”

3. Don’t be intimidated by the contractor with lots of paperwork. This contractor knows the pitfalls of relying on non-specific promises and the customers’ good nature to forgive an oversight. Yes, you’ll probably be signing more than one document when you proceed, but the paperwork is designed to make all aspects of the job as clear as possible so there are no misunderstandings.

4. Make a list of what ISN’T BEING DONE. With multiple bids, this will get a better “apples to apples” comparison, and prompt a discussion on those excluded items.

5. Ask-“Is there anything else in this job that we should discuss, or issues not covered that we should talk about?” This is a final “catch all” inquiry. Be quiet and wait as long as you can for an answer. Important issues often surface at this point.

GET IT IN WRITING! And good luck on your next home improvement project!

Monday, March 16, 2009

HOA-Approved & Maintenance-Free Windows

Homeowners' Associations have many goals. One primary goal is to establish a standard that will maintain home values by regulating the type and style of exterior remodeling. Properly regulated, association guidelines maintain the integrity of the neighborhood. Occasionally that means that a homeowner is prevented from achieving their remodeling goals.

When it comes to replacing your windows, many homeowners' associations consider vinyl windows unworthy of supporting the aesthetic style of the neighborhood and do not permit homeowners to install these maintenance-free windows. While many homeowners like the inexpensive price tag of vinyl windows, the Association knows that the product will not age well and that it will affect the future look of the neighborhood. Another alternative - wood windows - while initially attractive, can force the homeowner to maintain windows that degrade more rapidly due to the elements. This can become very costly for the homeowner and create unease between the homeowner and the association.

Fortunately, Andersen Windows has come up with a win-win solution for homeowners and their associations. Renewal by Andersen Replacement Windows are maintenance-free and have been approved by homeowners' associations all over the country. The window frames are not vinyl, but made of a patented superior product called Fibrex. This material takes a beating and still looks beautiful without any maintenance. In fact, the windows are self-cleaning and they come in three accent colors to frame your windows and enhance your home's exterior.

Tuesday, March 3, 2009

Choosing A Remodeling Contractor Part 2: Taking Time Up Front

Take time up front. The single best way to determine the professionalism of a contractor is to take tie up front. Allow yourself a minimum of one hour to sit down with each contractor where questions flow in both directions. Both of you will need to explore the issues, products, and pricing alternatives. Real professionals will want to invest time to explain their services in detail, uncover any questions, and analyze all issues involved.

Understand the contractor. Just as you are qualifying a contractor, the professional contractor is qualifying you. If you seem unreasonable, he may not bid your job. For example, if you do not allow the contractor ample time to review the project so that he is confident you understand everything about it, the professional will often not bid. Professional contractors fear a bad experience or lack of referrals when a non-satisfied homeowner has unrealistic expectations. Just as the professional realizes the critical aspect of this first meeting, the non-professional contractor is satisfied with a limited discussion of the project. This often results in work falling short of the customer's expectations.

Next: Getting the contractor to bid your job.

Monday, February 23, 2009

Choosing A Remodeling Contractor Part 1: Get It In Writing

A small percentage of remodeling jobs that become nightmares are unavoidable. However, the most potentially troublesome situations can be avoided with a little effort and diligence on the part of the homeowner. The critical challenge of a successful contracting project is selecting the right contractor. The results of your choice will leave a significant on your lifestyle. In order to protect yourself from an unqualified contractor, you need to find a professional that will deliver your project to your expectation and ultimate satisfaction. Here are some tips on selecting the right one.

Get it in writing. A professional contractor will have no problem working with you to answer any questions that will allow you to proceed with trust and confidence. Does the proposal include everything you require and have discussed with the contractor?

A professional contractor prefers having everything in writing since any ambiguities tend to obligate the responsible contractor. The unprofessional will talk in vague concepts, attempting to reassure you with general statements like "Don't worry, we'll take care of it," or "Trust me, everything will be alright." Remember: if it isn't in writing, it probably isn't included or will cost extra when you ask for it.

Next: Taking Time Up-Front